JMDR Wins Tarcoola to Kalgoorlie
Following ARTC’s successful trial of the Advanced Train Management System (ATMS) system near Whyalla, last year, JMDR was engaged by ARTC to update the generic design, perform detailed site specific designs, supply and manufacture, install, test and commission all of the Trackside Infrastructure required for the successful, safe deployment of ATMS on the 1,200km section of track between Tarcoola and Kalgoorlie.
Following a year long design optimisation and fabrication process, during 2023, JMDR will progressively replace the principal signalling components in each of the 90 location huts across the 35 loops that make up the vital east west connection across the Nullarbor