Woodville to Hamilton Resignalling-Commenced in August 2015 and scheduled for commissioning in August 2016. JMDR's Scope includes Signal Design (Microlok Data) with major changes to three Interlockings, Design Integrity Testing using Simulator and Manufacture & Installation of Control Panel.